• Partial reconstruction of Bolgatanga – Bawku road (12.5km)

    • Posted by: admin
    • Category: Bolgatanga - Bawku
    read more
  • Payment for asphaltic overlay on Ofankor- Asafansanta Maria road (14km) and collector roads in Tema Metropolis and other ancilliary works on selected roads in Tema Metropolis

    • Posted by: admin
    • Category: Tema
    read more
  • Payment for asphaltic overlay on Ofankor- Asafansanta Maria road (14km) and collector roads in Tema Metropolis

    • Posted by: admin
    • Category: Tema
    read more
  • Construction of Bleamezada-Agobledokui road (4.00km) lot 2

    • Posted by: admin
    • Category: Bleamezada- Agobledokui
    read more
  • Payment for construction of Bleamezada- Agobledokui road (4.00km) lot 2

    • Posted by: admin
    • Category: Bleamezada- Agobledokui
    read more
  • Emergency rehabilitation works -rehabilitation of old Ada and light industrial area roads, Tema.

    • Posted by: admin
    • Category: Tema
    read more
  • Upgrading of Berekum-Seikwa-Nsawkaw road (km 0 – 33.2)

    • Posted by: admin
    • Category: Berekum-Seikwa-Nsawkaw
    read more
  • Payment of work done in respect of surfacing of Kakpagyili-young feeder roads

    • Posted by: admin
    • Category: Kakpagyili
    read more
  • Dualization of Ho main road (Sokode Gborgame Civic Centre) and traffic management works

    • Posted by: admin
    • Category: Ho
    read more
  • Construction of flyover over the motorway from flower pot junction

    • Posted by: admin
    • Category: Tema
    read more