-
Payment of Work Done In Respect Of the Construction of Steel Bridge Over River Korhumu on Asuokawkaw-Akolrpaw Feeder Road
- July 21, 2020
- Posted by: admin
- Category: Asuokawkaw
No Comments -
Partial Reconstruction Of Trom Somanya Odumase Kpong Road(15.8km) As An Addendum To Upgrading Of Golokwati Wli Hohoe Road(Km10)
- July 21, 2020
- Posted by: admin
- Category: Trom Somanya
-
Reconstruction of Kpando – Worawora – Dambai Road, Phase Iii (Worawora – Dambai Section)
- July 21, 2020
- Posted by: admin
- Category: Kpando
-
Payment Of Work Done In Respect Of Bitumen Surfacing Of Mim Town Roads As Per Ipc No. 3 Dated 22nd January, 2015
- July 21, 2020
- Posted by: admin
- Category: Mim
-
Upgrading Of Sogakope Adidome Road (Km 7.0) Asiekpe – Mafi Kumasi Road (Km 0 -8.35) and Sogakope Shs Access Road (Km 1.8) Emergency Works
- July 21, 2020
- Posted by: admin
- Category: Sogakope
-
Construction of Ho-Fume Road (Km 7.0 and Km 28.7 -40.1)
- July 21, 2020
- Posted by: admin
- Category: Ho
-
Resealing/Partial Reconstruction of Apam -Ankamu – Afransi Road
- July 21, 2020
- Posted by: admin
- Category: Apam
-
Upgrading Of Dormaa Ahenkro Nkrankwanta Road (KM 10 – 20)
- July 21, 2020
- Posted by: admin
- Category: Dormaa-Ahenkro
-
Payment for the Upgrading Of Effiduase Senchi Jaunsi Road (10.2-20.0)
- July 21, 2020
- Posted by: admin
- Category: Effiduase
-
Partial Reconstruction of Have Kpando Road Lot1
- July 21, 2020
- Posted by: admin
- Category: Kpando