• Payment for construction of the Western Railway Line Project (phase 1-from Kojokrom to Eshiem)

    • Posted by: admin
    • Category: Kojokrom - Eshiem
    read more
  • Being payment for construction of 2 No. Small Dams/Dugout at Atuba and Boko in the Binduri Constituency of the Upper East Region (IPC 1) – NDA.

    • Posted by: admin
    • Category: Atuba & Boko
    read more
  • Being payment for 307 Mercedes Benz Sprinter Ambulance Vehicles

    • Posted by: admin
    • Category: Blank Location
    read more
  • Being part payment for supply of Theatre Equipment at Bibiani Hospital in the Bibiani Anhwiaso Bekwai Constituency (IPC 1) – CODA.

    • Posted by: admin
    • Category: Bibiani
    read more
  • Being part payment for supply of Forceps at Bibiani Hospital in the Bibiani Anhwiaso Bekwai Constituency – CODA.

    • Posted by: admin
    • Category: Bibiani
    read more
  • Being part payment for supply of Anethesia items at Bibiani Hospital in the Bibiani Anhwiaso Bekwai Constituency – CODA.

    • Posted by: admin
    • Category: Bibiani
    read more
  • BEING PAYMENT FOR THE COST OF RENOVATION OF CHIPS COMPOUND AT TATTIASI IN THE SISSALA EAST CONSTITUENCY

    • Posted by: admin
    • Category: Tattiasi
    read more
  • BEING PAYMENT FOR THE CONSTRUCTION OF 1NO.RURAL MARKET WITH STORAGE AND MECHANISED BOREHOLES IN THE DOME KWABENYA CONSTITUENCY AS PER THE ATTACHED

    • Posted by: admin
    • Category: Blank Location
    read more
  • Being payment for construction of 15 No. 10-Seater Water Closet Toilets with Mechanized Boreholes and Solar Panels at Sege, Ada, Shai-Osudoku and Trobu Constituencies (IPC 2) – CODA.

    • Posted by: admin
    • Category: Blank Location
    read more
  • Being payment for construction of 1.5M X 1.5M Storm Drain (Phase 1) at Old Town in the Akim Oda Constituency – MBDA.

    • Posted by: admin
    • Category: Old Town
    read more