• Construction of 2-stream Kindergarten Block at out Kwadwo L/A Prim. Sch.(MOFEP Letter No.B141/2014/SUTP/11 of 28/11/14, SPW No. 57031 & Cert. No 2 of 2/4/14)

    • Posted by: admin
    • Category: Otu-Kwadwo
    read more
  • Accra- Kumasi Highway Dualization Project Lot 6: Apedwa – Nsawam Bypass Nsawam Bypass Section including Bridges

    • Posted by: admin
    • Category: Nsawam
    read more
  • Rehabilitation of Nsawam -Apedwa road, Nsawam bypass section

    • Posted by: admin
    • Category: Nsawam
    read more
  • Rehabilitation Of Office Space and Headmistress Bungalow At Aburi Girls SHS

    • Posted by: admin
    • Category: Aburi
    read more